Sentridge Limited
Call Sentridge024 7655 3303
Email: sales@sentridge.com
Search  
 
Sentridge
Buy with Confidence
•3 Day Delivery
•100% Secure Shopping
•7 Day Money back Guarantee
•Free Delivery for Orders over £250
Terms
Sentridge - Protx Secure
Transactions on this site are protected by Protx the largest secure credit card payment facility in the U.K.
Protx
 
Energy
Alliance
Drives Alliance Founder Member
Strategic Partner
ABB Strategic Industrial Partner
UVDB VERIFY Approved
UVDB Verify Approved
News
Check here to get our latest news items
more info
 
Sentridge
 
Sentridge
 
Sentridge
Anglian Water Pitsea
Anglian Water Pitsea

A rolling programme of pump refurbishment with ABB drives is cutting electricity consumption by over a third at one of Anglian Water’s pumping stations.

The new submersible pumpset draws only 70A fitted with a drive, compared to 110A for the old configuration, while pumping a greater volume of water than before. The system works intermittently according to demand. If the motor runs, on average four hours per day, the new installation will use only about 61 kWh, compared to 100 kWh for the old one, saving £500 per year in energy. As the ABB variable speed drive is only running at 45 Hz, there is capacity in hand to increase the water flow still further if necessary.

Anglian Water’s Pitsea Terminal Pumping Station in Essex takes in waste water from a number of smaller pumping stations and sends it to the waste treatment plant on the same site. The pumping station is being upgraded in a programme that involves replacing the old pumps, motors and control systems.

The station has two floors, with a control system on the top floor controlling the Gilkes submersible pumpset on the floor below.

John Marin, Asset Enhancement Team Leader for Anglian Water’s South Essex region, says: “The control system running the motor was rapidly becoming obsolete and parts were becoming increasingly difficult to find.” The old control system achieved variable speed by using a small motor to push a connection along a regulating transformer, altering the tap off point to provide a varying voltage and so control the speed of the main motor.

Marin contacted ABB Drives Alliance and Motor Service partner Mid Kent Electrical (MKE), which installed and commissioned an ABB 55kW variable speed drive, an ABB 55kW motor and a submersible pump.

For Anglian, one of the main advantages of using MKE was that everything it needed came as part of the package. “It was a one stop shop,” said Marin. “MKE supplied everything including the cabling. We only had to place one order for all the mechanical and electrical services and we have been more than happy with the outcome.”

As well as energy saving, the new system provides easier, more effective control and reduces noise in the pumping station.

Contact us to discuss your application

Back to more case studies
Back to Energy Home

Basket Information
View Basket | Checkout
Sentridge
Sentridge
FuseStore | ABB Control | ABB Drive Hire | ABB Inverter Drive Spares | ABB Inverter Drives | ABB Soft Starts | BEI IDEACOD Encoders | Crouzet | Ensto Enclosure Systems | Entrelec Products | Ferraz Shawmut Products | Irisys Thermal Cameras | Jokab Light Curtains | Kuhnke Relays & Bases | Measurement & instrumentation | Panel Essentials | Siemens Control | STEGO Thermal Management | TEXA Fans