Sentridge Limited
Call Sentridge024 7655 3303
Email: sales@sentridge.com
Search  
 
Sentridge
Buy with Confidence
•3 Day Delivery
•100% Secure Shopping
•7 Day Money back Guarantee
•Free Delivery for Orders over £250
Terms
Sentridge - Protx Secure
Transactions on this site are protected by Protx the largest secure credit card payment facility in the U.K.
Protx
 
Energy
Alliance
Drives Alliance Founder Member
Strategic Partner
ABB Strategic Industrial Partner
UVDB VERIFY Approved
UVDB Verify Approved
News
Check here to get our latest news items
more info
 
Sentridge
 
Sentridge
 
Sentridge
BMW Mini Plant Oxford

Drives Save Money

ABB drives cut costs at MINI production plant

ABB drives installed on the new MINI paintshop at BMW Group Plant Oxford are saving the company £24,000 a year in electricity costs.

Twelve ABB Comp-AC drives, ranging from 11 to 37 kW, have been installed by ABB Drives Alliance partner MKE Drive Systems to run pumps on the pre-treatment plant.

"Following an energy audit, we recommended the Comp-AC range as being the most cost-effective option for the application," says MKE drive manager Gary Palmer. "We installed the drives and also implemented a communication network that would enable BMW to control the drives from remote PLCs."

Some of the pumps on the line showed dramatic savings once they were being run by the variable speed drives. "One pump was drawing 27kW, once it was properly speed controlled by the ABB Comp-AC drive we found it needed to draw only 6 kW. We have also installed a drive on the air extraction fan on the line, reducing the demand from 75kW to only 32 kW."

Variable speed drives achieve these energy savings by driving the motor at the speed needed by the process. This contrasts with the wasteful practice of running the motor at full speed and then choking off the output, air or water in the case of fans and pumps, with some kind of mechanical device, such as a baffle or valve.

"The main benefits we get are the flexibility to increase and decrease speed at will, compared to the previous method based on adjusting the pump valves," says Steve Edmunds, maintenance shift manager at BMW Group Plant Oxford. "We have now found the optimum speed for the pumps and are saving about 480,000 kWhrs a year on this facility."

"We have standardised on ABB motors throughout the plant, so it was natural to opt for ABB when looking for a variable speed drive for the pumps on the pre-treatment plant."

Payback time was only six months for the system.

Back to more case studies
Back to Energy Home

Basket Information
View Basket | Checkout
Sentridge
Sentridge
FuseStore | ABB Control | ABB Drive Hire | ABB Inverter Drive Spares | ABB Inverter Drives | ABB Soft Starts | BEI IDEACOD Encoders | Crouzet | Ensto Enclosure Systems | Entrelec Products | Ferraz Shawmut Products | Irisys Thermal Cameras | Jokab Light Curtains | Kuhnke Relays & Bases | Measurement & instrumentation | Panel Essentials | Siemens Control | STEGO Thermal Management | TEXA Fans