Sentridge Limited
Call Sentridge024 7655 3303
Email: sales@sentridge.com
Search  
 
Sentridge
Buy with Confidence
•3 Day Delivery
•100% Secure Shopping
•7 Day Money back Guarantee
•Free Delivery for Orders over £250
Terms
Sentridge - Protx Secure
Transactions on this site are protected by Protx the largest secure credit card payment facility in the U.K.
Protx
 
Energy
Alliance
Drives Alliance Founder Member
Strategic Partner
ABB Strategic Industrial Partner
UVDB VERIFY Approved
UVDB Verify Approved
News
Check here to get our latest news items
more info
 
Sentridge
 
Sentridge
 
Sentridge

Severn Trent Water Drives down costs

Severn Trent Water Drives down costs
Severn Trent Drive Pays Dividends
Severn Trent Water is saving thousands of pounds in energy and maintenance costs since replacing two old drives from the 1980s with the latest ABB standard drives at its Ladywood sewage pumping station in Ironbridge, Shropshire.

The combined savings mean that the new drives will pay for themselves in well under two years, whilst giving improved reliability. The drives were supplied by the ABB Drives Alliance,

“The existing drives were over 20 years old and had reached the end of their life expectancy. Spare parts were extremely expensive and difficult to get hold of,” says Glen Hickman,of “When one of the drives broke down, the cost for a single replacement part was as high as £2,500.”

“The old units were pretty well obsolete and we wanted a modern equivalent that we could rely on,” confirms Colin Davies, maintenance supervisor for Severn Trent’s sewerage operations in Shropshire.
Initially one of the old drives were replaced when it failed and then monitored the performance of the new ABB standard drive compared with the remaining older version.

The tests confirmed that by replacing the older technology with a new ABB standard drive, Severn Trent was saving 5.5 kW per hour for the same pumping duty, which adds up to an estimated energy saving of £1,700 per year. So even without the considerable maintenance savings, the new drive should pay for itself in just over two years.

As the ABB standard drive took up 80% less space than its predecessors, the retrofit was easy.

Removing the old drives at Ladywood and installing and commissioning the ABB standard drive took less than eight hours. This was helped by the relative simplicity of the electrical installation. “The old drives needed a lot of complex wiring to interface with the pumping station control system,’ says Hickman. “In fact, the wiring was so complex that it needed a dedicated control panel. The new installation needs only a few wires,“ he adds.


Back to more case studies
Story detail
Back to Energy Home

Basket Information
View Basket | Checkout
Sentridge
Sentridge
FuseStore | ABB Control | ABB Drive Hire | ABB Inverter Drive Spares | ABB Inverter Drives | ABB Soft Starts | BEI IDEACOD Encoders | Crouzet | Ensto Enclosure Systems | Entrelec Products | Ferraz Shawmut Products | Irisys Thermal Cameras | Jokab Light Curtains | Kuhnke Relays & Bases | Measurement & instrumentation | Panel Essentials | Siemens Control | STEGO Thermal Management | TEXA Fans