Energy Consumption reduced by 20 – 30% at Local Plastics Moulding Company

The Problem

A Leamington based plastics company using a Negri Bossi Moulding Machine needed to reduce production costs, but without compromising any of its daily manufacturing processes.

Sentridge’s Solution

During a week trial, energy comparisons were made at the incoming supply to the machine, measuring the original controls and Sentridge ABB VSD control. An amazing 20 – 30% energy savings were achieved. This impressive result means that the company would be able to save thousands in energy costs every year and reduce their CO2 emissions by tonnes per annum too.

The Full Story

We recently installed an ABB Solution on a standard Negri Bossi Moulding Machine at a site in Leamington Spa.

The data collected shows clearly the immediate and significant savings that are made during the Press Cycle.

During a week trial, energy comparisons were made at the incoming supply to the machine, measuring the original controls and Sentridge ABB VSD control
This allows the hydraulic motor to have an infinitely variable flow which is matched precisely to the demand of the machine, instead of proportional valves controlling flow and pressure, and burst-off valves dumping the excess oil.
After the application of the variable speed drive the speed of the moulding machine motor was reduced to the required level and thus saves energy.
The possible size of the savings is dependent upon the wall thickness and holding times of the press. Further reductions can be made by optimising other functions during the moulding process.
Savings could be seen immediately, and a simple switch was installed which allows the operator to revert to conventional control should the need arise.
The life of machinery is also extended and maintenance costs reduced due to the fact that motors no longer operate constantly at full speed.

20 – 30% energy savings have been achieved. This impressive result means that not was the company able to save thousands in energy costs every year, but also reduce their CO2 emissions by tonnes per annum too.

 

Proven Process to prove your savings on your site
You can opt to trial the system with Sentridge Control, which is often the best option to determine and outline the savings that you will achieve. The evidence is provided before any installation costs are incurred and the downtime is kept to a minimum. Short payback periods and no-hassle service make Sentridge Drives Solutions a viable and cost effective solution for you. Full installation and commissioning is provided and can be completed in most cases in one day.

NB: While this case study may be a few years old, the energy-saving proficiency of ABB drives remains highly relevant. Given the current electricity costs, the impact of ABB drive solutions has expanded even further.