Sentridge give running costs the squeeze at Lafarge Quarry
The Problem At the Lafarge Quarry the motor was started using a Soft-starter, which was drawing up to 5 times full load current. Obviously this is a huge waste of energy but as is the way with such high consumption machinery, it was deemed necessary, even best practice. However, running the process in this way […]
Read More

